EXSOTHyC – Exsolution-Based Nanoparticles for the Lowest Cost Green Hydrogen – Clean Hydrogen Partnership project

Duration: January 2024 – December 2026

The main objective of the EXSOTHYC is to develop and validate a next generation alkaline electrolyser short-stack prototype with a novel cell design containing disruptive sub-components and breakthrough materials to fulfil the future needs of gigawatt-sized storage of renewable energy.