SYRIUS – SOEC for Steel Plant 

Duration: January 2025 – June 2029

The SYRIUS project is aiming to integrate a 4.2 MW Solid Oxide Electrolysis Cell system into a steel plant to decarbonise production processes. Elcogen is providing stacks for the demonstrator and future full-scale integration.